ARC 3524 - Building Technology 2

Application of principles, practices and details of construction technology in the process of documenting design project.

 

Project 1 Building Plans/Fire-Fighting Plan

Project Duration: 7 weeks

In this project, students are required to Identify and select a project designed from Studio 5 among 5 group members. We are then required to translate the selected building into a cemplete set of architectural working drawing (for submission to the authorities), utilising all the formats and conventions of working drawing as they applied in contemporary architectural practice. We are to research and establish a basic understanding of statutory requirements from the authorities and fire safety guidelines and to implement the requirements into the project and also to research and establish a basic understanding of the structural system, building services, materials and other relevant technology and to apply the understanding into the project.

 

Submission requirement

Full set A1 drawings, including (but not restricted to):

  • Site Plan, Key Plan and Location Plan

  • Full set of Building Plans including Roof Plan

  • Fire-fighting Plans (BOMBA Plan)

  • Sections and Elevations

  • Door and window schedules

Project 2 Working Drawing: Construction/ Technical Drawing

Project Duration: 6 weeks

In tandem with the main project of Architecture Design Project Studio 6, students are to demonstrate knowledge of construction, technology, materials and building services, as well as UBBL and fire safety regulations in developing their architectural design project technically. With this, we must take into account the functionality of spatial requirement in relation to by-laws and regulations, ergonomics, environmental concerns and other issues to ensure a good, healthy, safe and comfortable living environment for users.

 

Submission requirement

Full set A1 drawings, including (but not restricted to):

  • One (1) Building Section

  • One (1) Elevation

  • One (1) Full Height Wall Section of selected portions of the building, corresponding to the Building Section (item ‘a’ above) with detailing call outs

  • Two (2) construction details featuring a major joint (e.g. wall/floor, roof/wall, etc.), corresponding to the Full Height Wall Section (item ‘c’ above)

  • Staircase Details

  • Toilet Details

bottom of page